Storm Shelter Installed Today

Monday, October 10, 2011

The storm shelter was installed today.  I am impressed, they did a great job.  Mike Smith and his worker showed up at 06:30 and immediately got to work, first measuring out on the floor, then cutting the concrete, then digging the hole.  After the hole was dug then dropped the shelter in, leveled it out, and brought in the concrete truck.  An hour later, they were done and gone by about 11:30.  Check out the pictures on facebook.  It is supposed to hold 8 to 12 but I would say that 6 – 8 would be comfortable.  I am very pleased and Colin was excited too.

See Photos HERE

Board meeting tomorrow nite.

http://takingshelter.com

http://facebook.com/colinscastle